May 7, 2025, 10:01 p.m.

20 million offered for repairs at Odesa boiler house

(Repair work at the Severnaya-1 boiler house. Photo: CPR)

The boiler at Pivdenna-1 boiler house in Odesa will be repaired for UAH 20 million. A tender has been announced to find a contractor.

The relevant information is available in the Prozorro electronic procurement system, according to the Center for Public Investigations.

The customer is the utility company"Heat Supply of Odesa". It is about the current repair of the hot water boiler PTVM-100 at the district boiler house "Pivnichna-1" located at 80-B Heroiv Odoniiv Defynyi Street. The cost of the work is UAH 20 million 128 thousand.

According to the documentation, it is planned to completely replace the lower convection package and boiler tent structure, as well as conduct hydraulic tests, dismantle worn parts, install new pipelines and thermal insulation, upgrade flues and remove construction waste.

The works include about 45 different technical operations, including welding, fabrication of metal structures, installation of new system elements and insulation of equipment. All this is aimed at improving the efficiency and reliability of the boiler house during the heating season.

Applications will be accepted until May 14, and the next day the auction will be held in an open bidding format with special features, which means a short time frame and, most likely, no competition.

The contractor has to complete all the planned works by the beginning of the heating season - October 20, 2025.

Earlier, Intent wrote how the Odesa City Heat Supply Utility stopped the operation of the Severna-1 boiler house due to the need to repair the pipe. On the eve of the start of the heating season, during an investigation of the work of the Odesa City Heating Company by the Center for Public Investigations, journalists found that the reconstruction of the chimney and flues of the Severna-2 district boiler house was supposed to be completed on November 1. And the dismantling of a part of the chimney of the district boiler house "Severnaya-1 " was supposed to be completed on September 30.

Ірина Глухова

You might also like:

May 2, 2025

Heating main to be reconstructed in Mykolaiv for over UAH 15 million

May 5, 2025

Bidding for reconstruction of water supply system started in Pervomaisk, Mykolaiv region

April 27, 2025

Mykolaiv Launches ₴19.4M Heating Main Repair Tenders with May

May 7, 2025

Kherson allocated tens of millions for the second time to repair water supply system: where did the budget funds go?

May 4, 2025

20 million allocated to rebuild water supply system in Mykolaiv

May 2, 2025

Preparations to build a modern wastewater treatment system near Odesa

May 8, 2025

Shelter for Stepkivska gymnasium in Mykolaiv region to be repaired by defendant in embezzlement case

May 3, 2025

Previously rejected company wins contract for restoration of a building in Odesa for the second time without an auction

April 30, 2025

Odesa Conservatory to pay almost 12 million for dormitory renovation

May 4, 2025

Construction of a shelter for a kindergarten and lyceum in Odesa region estimated at 98 million

May 5, 2025

Millions allocated to four educational institutions in Odesa region to modernize workshops

May 4, 2025

Winner of tender for repair of shelter in Kherson suspected of fraud

May 7, 2025

Almost doubling in price: new water tariffs for Odesa residents after the war

Mykolaiv has selected a contractor for the repair of the Yuzhnobug bridge

May 2, 2025

Contract for repair of Mykolaiv outpatient clinic awarded to a contractor with a history