April 21, 2025, 10:36 a.m.

Kherson Oblast Plans ₴58M Water Supply Rebuild Amid War Damage

(PHOTO: DREAM)

Kherson Oblast plans to rebuild the water supply system that was destroyed by the war. The project is worth more than UAH 58 million, but is still less than 2% funded. The work will include replacing water towers, laying pipes and reconnecting nearly 600 residents to quality water.

This was reported by the Center for Public Investigations with reference to the DREAM ecosystem.

A project for the reconstruction of the centralized water supply system was presented in the village of Kucherske, Beryslav district, Kherson region. The project was initiated by the Borozen village council.

Screenshot: DREAM

The water supply system in Kucherske was severely damaged as a result of Russia's armed aggression. Now it is operating in emergency mode: worn-out water towers need constant repair, there are frequent gusts, water is lost and its quality is deteriorating. As a result, residents are forced to use decentralized water sources, such as wells or boreholes with poor quality water.

The goal of the project is to improve the sanitary and epidemiological situation in the village, provide a stable round-the-clock water supply and create conditions for the return of residents, as well as promote economic development after the war.

The total cost of the project is more than UAH 58.1 million, of which only about UAH 927 thousand (1.59%) has been confirmed so far.

Screenshot: DREAM

The project provides for

As a result of the project implementation, about 572 villagers, a paramedic station, and social infrastructure facilities will be supplied with water. According to the description, the project is included in the Unified Project Portfolio and is in the status of implementation.

In addition, the reconstruction of the water supply system, which was damaged by shelling, has begun in the village of Borozenske, Beryslav district. Partial funding was provided by Germany. The project will provide quality water to 1840 residents and 17 institutions. Its estimated cost is UAH 188.6 million.

In addition, major repairs of the water supply network have begun in the village of Tavriyske, Kherson district. More than UAH 26 million is planned to be spent to resolve the emergency. The goal is to ensure stable water supply for more than 560 residents, reduce water losses and improve system efficiency.

Анна Бальчінос

You might also like:

April 13, 2025

Germany Funds Reconstruction of Water Supply for 1,840 Residents in Kherson Region

April 24, 2025

Kherson School Reconstruction Starts: ₴214M Project to Upgrade Facilities

April 28, 2025

Kherson Education Spent Over ₴23M on Energy and Repairs in Early

April 30, 2025

Херсон планує підземну електростанцію за ₴500 млн для зниження

April 27, 2025

Mykolaiv region plans ₴10.3M capital repair of preschool shelter

April 21, 2025

Mykolaiv Hospital Receives ₴32.9M for Emergency Department Overhaul

April 22, 2025

Mykolaiv Approves ₴121.7M Water Supply System Renovation Project

Kherson Authorities Sign ₴17.8M Contracts for Shelter Repairs Amid Scrutiny

April 20, 2025

Easter Train Delivers 1,250 Cakes and 2,500 Meals to Kherson IDPs

April 30, 2025

Company with criminal ties wins ₴100M Kyselivska gymnasium

April 29, 2025

Dobroslav Council Adds ₴1.48M for Mobilization Program, Total

April 23, 2025

Kherson Oncology Dispensary Seeks ₴7M for Autonomous Oxygen Station

April 24, 2025

Mykolaiv City Allocates ₴650M for Educational and Medical Upgrades

April 25, 2025

Contractor Linked to Fraud Wins ₴15M Kherson Ambulatory Project

April 27, 2025

Kherson Plans ₴45 Million Brachytherapy Equipment Purchase to