Feb. 11, 2025, 2:57 p.m.

Kherson Region Plans Restoration of 27 Facilities Damaged by Shelling

(Photo: Kherson Regional State Administration)

Kherson region will design the restoration of 27 facilities damaged by Russian shelling.

According to the press service of the Regional Military Administration, the Territorial Development Department of the Kherson Regional Military Administration, together with the communities, has compiled a list of 27 facilities that have been damaged by Russian attacks. UAH 23 million is provided for the development of project documentation for their restoration.

They noted that the regional budget will finance only 10% of the design costs, while the rest of the funds will be raised from local budgets.

The list of facilities includes:

According to the JMA, special attention will be paid to institutions located near the front line, as well as kindergartens that are planned to be converted to a mixed learning format.

Meanwhile, in the village of Novovorontsovka in the north of Kherson region, work continues to restore the water supply system. An additional UAH 40 million was raised for the modernization. The project is scheduled to be completed in June this year. Two new wells have already been constructed, one of which is powered by solar panels. Four more have been drilled and are in the process of being equipped, and one has temporarily suspended operations. However, the main problem with the village's water supply is outdated pipelines, which cause about 70% of water to be lost.

The public procurement portal Prozorro has published contracts for the production of design estimates for the construction of protective structures in two educational institutions, one in Kherson and the other in the region.

According to Oleksandr Prokudin, the head of the Regional Military Administration, 11 protective structures are planned to be completed this year, and 5 more are to be built from scratch.

Ірина Глухова

You might also like:

April 28, 2025

Kherson Education Spent Over ₴23M on Energy and Repairs in Early

April 24, 2025

Kherson School Reconstruction Starts: ₴214M Project to Upgrade Facilities

April 21, 2025

Kherson Oblast Plans ₴58M Water Supply Rebuild Amid War Damage

April 24, 2025

Mykolaiv City Allocates ₴650M for Educational and Medical Upgrades

April 28, 2025

Russian Shelling Damages Homes and Infrastructure in Kherson, 8

April 22, 2025

Kherson Authorities Sign ₴17.8M Contracts for Shelter Repairs Amid Scrutiny

April 27, 2025

Mykolaiv region plans ₴10.3M capital repair of preschool shelter

April 24, 2025

Kherson Implements Light Camouflage and Mobilization Measures Amid Increased Security Risks

April 26, 2025

Tender for ₴19.3M radiation shelter overhaul in Stepkivka

Kherson residents affected by russian shelling to receive

April 21, 2025

Mykolaiv Hospital Receives ₴32.9M for Emergency Department Overhaul

April 29, 2025

Russian Forces Attack 39 Settlements in Kherson Region, 12

April 30, 2025

Odesa Region Plans ₴72.7M Radiation Shelter at Lyceum No. 1 with

April 25, 2025

Contractor Linked to Fraud Wins ₴15M Kherson Ambulatory Project

April 27, 2025

Russian shelling kills 3, injures 30 in Kherson region, damages