March 13, 2025, 12:01 p.m.

Odesa Signs ₴37M Contract for Kofa Canal Bridge Overhaul on Izmail-Kilia-Vylkove Highway

(Infrastructure Restoration and Development Service of Odesa Region)

On March 12, the Service for Infrastructure Restoration and Development in Odesa Region signed a contract with Odesa-based Rostdorstroy for additional work on the overhaul of the bridge over the Kofa Canal on the national highway Izmail-Kilia-Vylkove.

The contract is worth UAH 37 million 945 thousand, reports Intent's correspondent with reference to the Prozorro website.

The procurement was conducted without the use of an electronic system, as Odesa is the key contractor for the renovation of this highway.

As explained in the accompanying document, following an open tender, Rostdorstroy received a contract worth UAH 130 million 863 thousand on November 23, 2023, to repair the bridge at km 37+985. However, in February 2025, according to the results of the technical council, during the execution of the work, "the need for work that was not provided for in the terms of the project documentation was identified."

"Taking into account the priority of the public road of national importance T-16-07 Izmail-Kilia-Vylkove, the bridge at km 37+985, additional work was required," the protocol says.

The contractor has until the end of 2025 to utilize the above amount.

In February of this year, the Cabinet of Ministers of Ukraine approved the procedure for using state budget funds for the development and maintenance of public roads in 2025 by Resolution No. 174. The document provides for the allocation of UAH 181 million 817 thousand 100 from the state budget for the overhaul of the T-16-07 Izmail-Kilia-Vilkovo, a bridge at km 37 + 985.

The T-16-07 highway connects three towns and is strategically important for four communities in the district - grain trucks and other heavy vehicles carrying goods of various economic importance use the highway.

For years, residents of the Kiliya and Vylkove communities have been complaining about the terrible condition of the T-16-07 road, writing letters and appeals. Until 2024, it was virtually impassable.

The highway upgrade will shorten the route between Izmail and Kiliya from 130 km to 45 km. Emergency services will be able to get to call points faster, and children will be able to get to schools.

It was planned to resurface the road in 2022, but the project was frozen due to Russia's full-scale invasion.

Антоніна Лубченко

You might also like:

April 25, 2025

Odessa awards ₴8.9M contract to Evrodor for street and sidewalk

April 27, 2025

Odesa Region Seeks Contractor for ₴2.6M Road Repair in Nova

April 17, 2025

Mykolaiv Allocates ₴19.7M for Pivdenobugskyi Bridge Maintenance Tender

April 30, 2025

Company with criminal ties wins ₴100M Kyselivska gymnasium

April 24, 2025

Odesa's City Technologies Wins ₴1.5M Dredging Contract Without Tender

April 21, 2025

Mykolaiv Allocates ₴14M for Road Repairs, Tender Deadline April 28, 2025

April 29, 2025

Dobroslav Council Adds ₴1.48M for Mobilization Program, Total

April 23, 2025

Kherson District Awards ₴68.9M Road Maintenance Contract to Paritetbudinvest Amid Controversy

April 27, 2025

Mykolaiv Launches ₴19.4M Heating Main Repair Tenders with May

April 20, 2025

Odesa's Artsyzka Council Selects DSK Avtoshlyakh for ₴3.5M Road Maintenance

April 27, 2025

Odessmisksvitlo announces ₴18.5M tenders for energy-saving

April 20, 2025

Odesa City Council Awards ₴17.8M Road Repairs to Odeskolovpostach

April 23, 2025

Odesa Plans New Transport Interchange for Arkadiyske Plateau Amid Traffic Issues

April 22, 2025

Mykolaiv Approves ₴121.7M Water Supply System Renovation Project

April 25, 2025

Court Grants Access to Docs in ₴100M Mykolaiv Budget Fraud Case